FREE PREVIEW · PORTAL ONLY
ExAC 2026 Master Reading List
MAPPED TO SECTION THEMES · APPENDIX 1
Built against the ExAC 2026 Preparation Guide (four sections / thirteen objective themes, Appendix 1) with references drawn from Appendix 3. Theme numbers follow Appendix 1 of the guide. Where a chapter maps to more than one theme, its lowest-numbered theme is home; higher-numbered occurrences carry a cross-reference note.
◆ LIVING DOCUMENT — REVIEWED AND REVISED AS CONTENT IS ADDED
Ching BCI scope: Chapters 1–7, 11, 12 only ·
CHOP: Parts 3, 4, 5, 6 only (3rd Ed., 2020–2022) ·
Section 2: NBC 2020 and NECB 2020 are provided at the exam and tested directly — secondary readings listed here only
SOURCES
CHOP
CHING BCI
CCDC
RAIC
NRC CTU
CLF
OTHER
Exact chapter/page references and descriptions are part of the full plan — themes, sources, and filters below still work. Upgrade to reveal every reference.
SECTION 1
Programming, Site, Engineering Systems, Cost
THEME 01
Programming
- CHOP ••• Full reference — unlocks with full access
- CHOP ••• Full reference — unlocks with full access
- OTHER ••• Full reference — unlocks with full access
THEME 02
Site and Environmental Analysis
- CHOP ••• Full reference — unlocks with full access
- CHING ••• Full reference — unlocks with full access
THEME 03
Coordinating Engineering Systems
- CHOP ••• Full reference — unlocks with full access
- CHOP ••• Full reference — unlocks with full access
- CHING ••• Full reference — unlocks with full access
- CHING ••• Full reference — unlocks with full access
THEME 04
Cost Management
- CHOP ••• Full reference — unlocks with full access
- CHOP ••• Full reference — unlocks with full access
- CHOP ••• Full reference — unlocks with full access
- CHOP ••• Full reference — unlocks with full access
- CHOP ••• Full reference — unlocks with full access
- RAIC ••• Full reference — unlocks with full access
SECTION 2
National Building Code (NBC 2020) & National Energy Code (NECB 2020)
Direct code testing is expected here. The NBC 2020 and NECB 2020 are provided at the exam and are the primary references — items below are secondary support only.
THEME 05
NBC 2020 / NECB 2020
- CHOP ••• Full reference — unlocks with full access
SECTION 3
Schematic Design, Design Development, Final Project, Sustainability
THEME 06
Schematic Design
- CHOP ••• Full reference — unlocks with full access
- CHOP ••• Full reference — unlocks with full access
THEME 07
Design Development
- CHOP ••• Full reference — unlocks with full access
- CHOP ••• Full reference — unlocks with full access
THEME 08
Final Project — Materials, Construction Systems, Envelope, Structure
- CHING ••• Full reference — unlocks with full access
- CHING ••• Full reference — unlocks with full access
- CHING ••• Full reference — unlocks with full access
- CHING ••• Full reference — unlocks with full access
- CHING ••• Full reference — unlocks with full access
- CHING ••• Full reference — unlocks with full access
- CHING ••• Full reference — unlocks with full access
- NRC CTU ••• Full reference — unlocks with full access
- NRC CTU ••• Full reference — unlocks with full access
- NRC CTU ••• Full reference — unlocks with full access
- NRC CTU ••• Full reference — unlocks with full access
- NRC CTU ••• Full reference — unlocks with full access
- NRC CTU ••• Full reference — unlocks with full access
THEME 13
Sustainable Design Literacy
OBJ. 13 · SECTION 3
- CLF ••• Full reference — unlocks with full access
- CHOP ••• Full reference — unlocks with full access
- CHING ••• Full reference — unlocks with full access
SECTION 4
Bidding, Construction (Office & Site), Management
THEME 09
Bidding and Contract Negotiations
- CHOP ••• Full reference — unlocks with full access
- CHOP ••• Full reference — unlocks with full access
- CCDC ••• Full reference — unlocks with full access
- CCDC ••• Full reference — unlocks with full access
- RAIC ••• Full reference — unlocks with full access
THEME 10
Construction Phase: Office Functions
- CHOP ••• Full reference — unlocks with full access
- CHOP ••• Full reference — unlocks with full access
- CHOP ••• Full reference — unlocks with full access
- CCDC ••• Full reference — unlocks with full access
- RAIC ••• Full reference — unlocks with full access
THEME 11
Construction Phase: Site (Field) Functions
- CHOP ••• Full reference — unlocks with full access
- CHOP ••• Full reference — unlocks with full access
- CCDC ••• Full reference — unlocks with full access
THEME 12
Management of the Project & Business/Practice Management
- CHOP ••• Full reference — unlocks with full access
- CHOP ••• Full reference — unlocks with full access
- CHOP ••• Full reference — unlocks with full access
- CHOP ••• Full reference — unlocks with full access
- CHOP ••• Full reference — unlocks with full access
- CHOP ••• Full reference — unlocks with full access
- RAIC ••• Full reference — unlocks with full access
- RAIC ••• Full reference — unlocks with full access
INDEX
Reverse Index — Where Each Source Maps
CHOP
Part 3 — Management of the Architectural Practice
- ••• Full reference — unlocks with full access
CHOP
Part 4 — The Design-Construction Program
- •••Full reference — unlocks with full access
- •••Full reference — unlocks with full access
CHOP
Part 5 — Management of the Design Project
- •••Full reference — unlocks with full access
- •••Full reference — unlocks with full access
- •••Full reference — unlocks with full access
- •••Full reference — unlocks with full access
- •••Full reference — unlocks with full access
- •••Full reference — unlocks with full access
CHOP
Part 6 — Phases of the Design Project
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
CHING BCI
Building Construction Illustrated, 7th Ed.
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
NRC CTU
Construction Technology Updates
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
CONTRACTS
Contract & Fee Documents
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access
- ••••••Full reference — unlocks with full access