BACK TO PORTAL
FREE PREVIEW · PORTAL ONLY

ExAC 2026 Master Reading List

MAPPED TO SECTION THEMES · APPENDIX 1

Built against the ExAC 2026 Preparation Guide (four sections / thirteen objective themes, Appendix 1) with references drawn from Appendix 3. Theme numbers follow Appendix 1 of the guide. Where a chapter maps to more than one theme, its lowest-numbered theme is home; higher-numbered occurrences carry a cross-reference note.

◆ LIVING DOCUMENT — REVIEWED AND REVISED AS CONTENT IS ADDED
Ching BCI scope: Chapters 1–7, 11, 12 only  ·  CHOP: Parts 3, 4, 5, 6 only (3rd Ed., 2020–2022)  ·  Section 2: NBC 2020 and NECB 2020 are provided at the exam and tested directly — secondary readings listed here only
SOURCES
CHOP CHING BCI CCDC RAIC NRC CTU CLF OTHER
Exact chapter/page references and descriptions are part of the full plan — themes, sources, and filters below still work. Upgrade to reveal every reference.
FILTER BY SOURCE
JUMP TO THEME
SECTION 1 Programming, Site, Engineering Systems, Cost
THEME 01 Programming
  • CHOP ••• Full reference — unlocks with full access
  • CHOP ••• Full reference — unlocks with full access
  • OTHER ••• Full reference — unlocks with full access
THEME 02 Site and Environmental Analysis
  • CHOP ••• Full reference — unlocks with full access
  • CHING ••• Full reference — unlocks with full access
THEME 03 Coordinating Engineering Systems
  • CHOP ••• Full reference — unlocks with full access
  • CHOP ••• Full reference — unlocks with full access
  • CHING ••• Full reference — unlocks with full access
  • CHING ••• Full reference — unlocks with full access
THEME 04 Cost Management
  • CHOP ••• Full reference — unlocks with full access
  • CHOP ••• Full reference — unlocks with full access
  • CHOP ••• Full reference — unlocks with full access
  • CHOP ••• Full reference — unlocks with full access
  • CHOP ••• Full reference — unlocks with full access
  • RAIC ••• Full reference — unlocks with full access
SECTION 2 National Building Code (NBC 2020) & National Energy Code (NECB 2020)
Direct code testing is expected here. The NBC 2020 and NECB 2020 are provided at the exam and are the primary references — items below are secondary support only.
THEME 05 NBC 2020 / NECB 2020
  • CHOP ••• Full reference — unlocks with full access
SECTION 3 Schematic Design, Design Development, Final Project, Sustainability
THEME 06 Schematic Design
  • CHOP ••• Full reference — unlocks with full access
  • CHOP ••• Full reference — unlocks with full access
THEME 07 Design Development
  • CHOP ••• Full reference — unlocks with full access
  • CHOP ••• Full reference — unlocks with full access
THEME 08 Final Project — Materials, Construction Systems, Envelope, Structure
  • CHING ••• Full reference — unlocks with full access
  • CHING ••• Full reference — unlocks with full access
  • CHING ••• Full reference — unlocks with full access
  • CHING ••• Full reference — unlocks with full access
  • CHING ••• Full reference — unlocks with full access
  • CHING ••• Full reference — unlocks with full access
  • CHING ••• Full reference — unlocks with full access
  • NRC CTU ••• Full reference — unlocks with full access
  • NRC CTU ••• Full reference — unlocks with full access
  • NRC CTU ••• Full reference — unlocks with full access
  • NRC CTU ••• Full reference — unlocks with full access
  • NRC CTU ••• Full reference — unlocks with full access
  • NRC CTU ••• Full reference — unlocks with full access
THEME 13 Sustainable Design Literacy OBJ. 13 · SECTION 3
  • CLF ••• Full reference — unlocks with full access
  • CHOP ••• Full reference — unlocks with full access
  • CHING ••• Full reference — unlocks with full access
SECTION 4 Bidding, Construction (Office & Site), Management
THEME 09 Bidding and Contract Negotiations
  • CHOP ••• Full reference — unlocks with full access
  • CHOP ••• Full reference — unlocks with full access
  • CCDC ••• Full reference — unlocks with full access
  • CCDC ••• Full reference — unlocks with full access
  • RAIC ••• Full reference — unlocks with full access
THEME 10 Construction Phase: Office Functions
  • CHOP ••• Full reference — unlocks with full access
  • CHOP ••• Full reference — unlocks with full access
  • CHOP ••• Full reference — unlocks with full access
  • CCDC ••• Full reference — unlocks with full access
  • RAIC ••• Full reference — unlocks with full access
THEME 11 Construction Phase: Site (Field) Functions
  • CHOP ••• Full reference — unlocks with full access
  • CHOP ••• Full reference — unlocks with full access
  • CCDC ••• Full reference — unlocks with full access
THEME 12 Management of the Project & Business/Practice Management
  • CHOP ••• Full reference — unlocks with full access
  • CHOP ••• Full reference — unlocks with full access
  • CHOP ••• Full reference — unlocks with full access
  • CHOP ••• Full reference — unlocks with full access
  • CHOP ••• Full reference — unlocks with full access
  • CHOP ••• Full reference — unlocks with full access
  • RAIC ••• Full reference — unlocks with full access
  • RAIC ••• Full reference — unlocks with full access
INDEX Reverse Index — Where Each Source Maps
CHOP Part 3 — Management of the Architectural Practice
  • ••• Full reference — unlocks with full access
CHOP Part 4 — The Design-Construction Program
  • •••Full reference — unlocks with full access
  • •••Full reference — unlocks with full access
CHOP Part 5 — Management of the Design Project
  • •••Full reference — unlocks with full access
  • •••Full reference — unlocks with full access
  • •••Full reference — unlocks with full access
  • •••Full reference — unlocks with full access
  • •••Full reference — unlocks with full access
  • •••Full reference — unlocks with full access
CHOP Part 6 — Phases of the Design Project
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
CHING BCI Building Construction Illustrated, 7th Ed.
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
NRC CTU Construction Technology Updates
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
CONTRACTS Contract & Fee Documents
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access
  • ••••••Full reference — unlocks with full access